• 4 MONTHS
    27MW: The fastest delivery at a speed of 27MW within 4 months
  • 50000 PFlops(FP32)
    Maximum Supportable Computing Power
  • 1356 MW
    Total Capacity
  • 5 +GW
    Renewable Energy Reserves
HOYINN
TO BE THE LEADING ECOSYSTEM OF CROSSING 
GREEN ENERGY AND DATA INDUSTRIES
DC & RENEWABLES SYNERGY CASE
THE INTEGRATION OF “SOURCE-GRID-LOAD-STORAGE” PRACTICE
LARGEST “SOURCE-GRID-LOAD-STORAGE” INTEGRATED DEMONSTRATION PROJECT IN THE CORE AREAS SURROUNDING BEIJING

  • SOURCE
    In the Zhangjiakou area(i.e,zhangbei,guyuan,yu county), wind and solar power projects are being implemented

  • GRID
    Plan in batches and adopt the project access scheme. Ensure the consumption of green electricity and realize the transmission to the southern area of Zhangjiakou. The outbound line is 515 kilometers long and there are 15 booster stations. 

  • LOAD
    HOYNN (Huailai) Technology Industrial Campus
  • STORAGE
    Deploy energy storage on the power supply side and develop shared and independent energy storage .
  • SOURCE
  • GRID
  • LOAD
  • STORAGE
Back
OUR PARTNERS
Leading companies choose HOYINN