Solutions
Data Center Green Energy
A highly available and flexible digital infrastructure platform will be built to realize the sharing, scheduling and efficient management of universal computing and storage capacity, so as to provide a computing base for the construction of a digital society and a powerful impetus for the development of scientific and technological innovation.
High-performance computing equipment will be equipped and efficient computing resource management capabilities will be developed to provide users with an artificial intelligence platform based on deep learning, enable customers to customize intelligent models, accelerate the development of intelligent ecosystem, and drive the aggregation of intelligent industries.
Provide (CPU and GPU) heterogeneous computing nodes to offer powerful single-node computing performance and support heterogeneous acceleration; provide nearline storage and core data backup capabilities to improve data read and write efficiency and ensure data security; allow supercomputing power to empower progress in the development of big data, artificial intelligence and other technologies.
We Provide a Whole Life Cycle Service of Neo-green Computing Cluster
Meet the needs of business development, and form a full-life cooperative strategic relationship with customers
Green Power

Green Power Supply

Green Power
Built-to-suit

Integrated Exploitation

Full Operation

Built-to-suit
FULL-LIFE COOPERATIVE STRATEGIC
RELATIONSHIP WITH CUSTOMERS
Carbon Neutral Target

Energy saving technology

Zero Carbon Service

Carbon Neutral Target
Flexible Cooperation Model

Diversified Biz Model

Flexible Cooperation Model
COMPREHENSIVE CONSTRUCTION AND OPERATION OF HYPERSCALE DATA CENTER CLUSTER
Hyperscale Integrated Exploitation
Through green site selection, professional design, fast delivery, and green supply chain, the ultimate optimization of natural resource utilization pattern and the standardization and modularization of engineering products, HOYINN achieves effective cost reduction and long-term high-quality development.
Standardization
Physical separation of land
Ring network
Municipal integrated pipe gallery
Self-built substation
Customization
High availability and efficiency design to support client business space flexible deployment and unlimited expansion
Productization
Standardized and productized to deliver E&M projects in 3.5 months at the earliest
Systematization
Cluster-level O&M
Greenization
Integrated energy management
Load side energy storage on
Energy & carbon management system
“Green Energy” to Power “Green Industry”
Relying on industrial cooperation, HOYINN obtains stable green power from renewable energy projects in Guyuan, Zhangbei and Yu County in Zhangjiakou to achieve 100% green electricity supply.
Green Energy
New Computing Cluster
Complete power grids
Sufficient land resources
The national hub node
Energy storage is deployed on both the supply side and load side
Enriched green energy
Wind, Solar, Biomass, Water,
Nuclear