AIDC INFRASTRUCTURE SOLUTIONS

Supporting leapfrog growth of AI computing power with centralized layout, high-density networks, efficient cooling system, sufficient green power,
rapid architecture iteration and integrated delivery capability, navigating intelligent computing power and decoding new quality productivity

CENTRALIZED

HYPERSCALE AI COMPUTING CLUSTER

  • HYPERSCALE
    CONTINUOUS EXPANSION

    The aggregation of multiple independent units above 50MW can meet the carrying demands when intelligent computing power surges exponentially. Adequate and sustainable power supply.

  • HIGH-DENSITY NETWORK
    COMMUNICATIONS

    The communication distance within a single data center is <100m, the communication distance

    between single data centers is <500m, and the spatial arrangement meets the optimal

    communication distance for Al computing power.

  • CLUSTER-LEVEL
    STANDARDIZATION SERVICE

    Aggregation of multiple independent units of 50MW or more to meet the demand for hosting the exponential surge of smart computing power

    Adequate and sustainable supply of electricity

GREEN

New energy development and the construction of power transmission and distribution

  • Wind PowerGuyuan Zhangbei
    3990MW
  • POTOVOLTAICYu county、Guyuan、Zhangbei
    1540MW
  • BOOSTER STATIONS
  • 500+KM OUTBOUND LINES
EFFICIENT

  • Reduction of civil works area by more than 40%,Extra large single room setup,Quantity increased to 700+

    Civil engineering front-loading and shortening the construction period by more than 30%

    Structural loads increase forward-looking parameterization, and structural framing is set for the full amount of the roof

  • Air-cooled and liquid-cooled proportional flexible compatibility

    Air-cooled for low-density cabinet 6~16kW

    Liquid-cooled for high-density cabinet 21~60kW

  • Multiple cooling solutions matched to various GPU

    Supports various liquid cooling technologies including immersion/cold plate/spray type Meet various scales including large customization, room level, POD level, etc.

  • Full Life Cycle Management for Data Energy Carbon
    1. High availability
      Upgrade the O&M system for AI
      Realize high availability of power supply&cooling systems
      Cope with sustained high loads and sudden increases and decreases in volatility
    2. Ultimate energy saving
      Self-research energy carbon management system
      Connecting Energy Intelligent Management and Data Center Intelligent Operation and Maintenance
      Fine-tuning Data Center Energy Consumption
    3. Greening the whole life cycle
      Adoption of green power trading and rightsizing,Addressing the full range of carbon
      neutrality needs of the computational infrastructure
ACCELERATED

Integrated Full Stack Delivery Capability

REFRESH INDUSTRY
SPEED BY HOYINN QUALITY
DEDICATED
PROJECTTEAM TACKLE
  • Design
    Design

    Flexible power design to simultaneously meet customer requirements for high power density and liquid-cooled server deployments, 100% customization to address

  • Construction
    Construction

    Flexible power design to simultaneously meet customer requirements for high power density and liquid-cooled server deployments, 100% customization to address customer needs

    Reducing engineering implementation workload during the construction period and designing flexible solutions to cope with customers' unexpected business needs

  • Procurement
    Procurement

    Centralized procurement, procurement front-end, moderately shorten the overall time of the process, reduce costs and increase efficiency

    scientific management mechanism from stockpiling to strategic selection

  • Operation
    Operation

    Standard guidance + equipment difficulty support + quality assessment + compliance system + intelligent system, to ensure a large-scale burst of open services